Coffee Shop case study. One integrated project, one learning experience. From site observation to space design.
16 complete meetings from Orientation & Object Selection to Reflection & Closing. Equipped with key topics, case studies, and exercises.
Collection of primary and supporting literature from Francis D.K. Ching, Simon Unwin, Juhani Pallasmaa, Peter Zumthor, and others. Arranged per meeting.
16 meetings with Mini Workshop (Independent/WFA) and Guided Workshop (WFO). Each meeting is equipped with objectives, tools, steps, duration, output, and assessment criteria.
Choose a small cafe (80-200m²), 1 floor, flat site. Focus on observation, documentation, user analysis, space, elements, and problem synthesis. Mandatory manual (hand sketch).
Design a new cafe on a 20x20m site (400m²), building area ±120-150m², capacity ±30 visitors. Focus on concept, program, zoning, mass, form, and elements. Digital allowed for technical drawings.
Capacity ±30 visitors (±20 indoor, ±10 outdoor). Staff: 1 Manager, 2 Baristas, 1 Kitchen, 1 Cashier, 1 Service/Cleaning. Total 6 staff.
Traditional/Local, Classical, Modern, Contemporary, Industrial, or Unique/Experimental.
Check if output has received lecturer initials.
| Date / Day | Focus / Material | Output (A3) | Lecturer Check |
|---|---|---|---|
| WFO Sep 30 (Wed) |
Orientation & Object Selection Studio Introduction & Cafe Object Selection. |
A01 (Object & Reason) | Does the object meet criteria (80-200m², 1 floor)? |
| WFA Oct 2 (Fri) |
Observation & Context Object Observation & Site Context. |
A02 (Site & Context) | Road access, orientation, surrounding environment. |
| WFO Oct 5 & 7 |
Exterior & Interior Mass, Openings, Material, Atmosphere Documentation. |
A03 & A04 | Manual sketch (not tracing), dominant material. |
| WFO Oct 12 & 14 |
User & Activity Mapping Users & Activity Mapping. |
A05 & A06 | Visitor vs staff flow, circulation conflicts. |
| WFA/WFO Oct 16 - 21 |
Space, Zoning & Circulation Existing Floor Plan, Zoning, Circulation. |
A07, A08, A09 | Public/service zoning, entry-exit flow. |
| WFA/WFO Oct 23 - 28 |
Elements, Character & Atmosphere Architectural Elements, Style, Atmosphere. |
A10, A11, A12 | Character proven by material elements. |
| WFA/WFO Oct 30 - Nov 4 |
Synthesis (SWOT & Problem) Strengths, Weaknesses, Problem Synthesis. |
A13, A14, A15 | Cause-and-effect relationship of problems. |
| WFA/WFO Nov 6 - 13 |
Intervention & Final Drawing Improvement Ideas & Technical Drawings. |
A16-A23 (Total 35-41 A3) | Consistency of floor plan, section 1:50, elevation. |
| UTS Nov 16 (Mon) |
MID-TERM EXAM (UTS) Task 1 Presentation (Read Architecture). |
35-41 A3 + Presentation | - |
| WFO/WFA Nov 18 - 20 |
Design Brief & Program (Task 2) New Concept & Space Program. |
B01, B02, B03 | New concept, site 20x20m, capacity 30 people. |
| WFO/WFA Nov 23 - 27 |
Zoning & Massing Zoning & Mass Alternatives. |
B04, B05, B06, B07 | Mass supports zoning & activity. |
| WFO/WFA Nov 30 - Dec 4 |
Space & Form Development Floor Plan, Circulation, Section, Elevation. |
B08, B09 | Consistency of Plan-Section-Elevation. |
| WFO Dec 7 - 9 |
Elements, Character & Atmosphere (Task 2) Material, Elements, Style Application. |
B10 | Consistency of style with material. |
| WFA Dec 11 (Fri) |
Finalization & UAS Preparation Finalization of Drawings & Layout. |
B11 (8 A3) | Completeness & presentation layout. |
| UAS Dec 14 (Mon) |
FINAL EXAM (UAS) Task 2 Presentation (Create Architecture). |
40-44 A3 + Final Presentation | - |
| Indonesia | English |
|---|---|
| Bukaan | Opening |
| Zoning | Zoning |
| Massa Bangunan | Building Mass |
| Sirkulasi | Circulation |
| Potongan | Section |
| Tampak | Elevation |
| Denah | Floor Plan |
| Atmosfer | Atmosphere |
| Pengguna | User |
| Pemetaan Aktivitas | Activity Mapping |
Task 1 (Read Architecture) is MANDATORY manual (hand sketch). Task 2 (Create Architecture) may use digital software for technical drawings, but initial idea sketches are still recommended manual.
Site size is 20m x 20m (400 m²). It does not have to be a perfect square, as long as the total area is around 400 m². The building area designed is ±120-150 m².
Not mandatory. Parking and landscape are not the assessment focus in SPA 1. Focus on Indoor-Outdoor relationships, cafe circulation, and materials.
Minimum attendance is 75% of total meetings. If less than 75%, student DOES NOT PASS. Ensure communication with lecturer if unable to attend.
Yes, different. WFO book is stored at campus (cannot be taken home), while WFA book is brought by student for independent work on Friday.